Sunday, May 2, 2010

Allison's Baptism

Allison was baptized on May 1, 2010. It was a wonderful day and she was bouncing out of her skin she was so excited. All of the Ashton's were there except for Jens who is on his mission in Chile. Grammy and Grandpa Day even came from North Carolina just to be here for the special occasion.
(Note: My camera had something on the lens so some of the pictures have a little blurry spot. Super Sadness! For better pictures see Catherine's blog.)

Allison outside our ward meetinghouse before going in to get dressed and ready for the baptism. She is wearing the new dress she found with Grammy Day just that morning.

Outside the church after the baptism we all gathered for pictures before heading over to our house for lunch.

Allison was baptized and confirmed by Dave. It took two tries to baptize her because her foot came up the first time. I think she might be a little proud of that. At least Dave remembered her full name. The other father in our ward baptizing his daughter accidentally said her older sister's middle name and had to do it over again with her own name. Oops. He felt a little sheepish.

Mommy's Little Angels

Wednesday, April 21, 2010

Spaghetti Night

Oh yeah, this is why we don't have spaghetti as often as Allison would like. How could I forget?
Kristen doesn't understand why I think she needs to have her face washed. Why would I want to torture her like that? (Loryn hams it up in the background.)

Loryn tried to convince me she could just lick it all off with her tongue.
"See Mom, I just lick it."
I wasn't convinced she could get it off her eyebrows though.



Loryn's Sliver

Back on March 28 Loryn was playing outside and got hurt. She came in crying with a small cut on her foot (we thought). We were concerned there might be a sliver but couldn't see anything. We continued to watch it for a few days in which time it became infected. That Friday I took her to the pediatrician who got about 5 ml of puss out of it and put her on an antibiotic. He said if it didn't get better by Monday to take her to a podiatrist.

So on Monday, April 5, 2010 I took her to a podiatrist. They did an ultrasound but couldn't really see anything and told us to come back on Wednesday. When we went back they were able to get a better ultrasound picture of her foot and could see there was a foreign object they thought was about 1 cm long.

We decided to do out-patient surgery the next day and were scheduled for 7:30 am. I got there with Loryn on time but as I was filling out the paperwork at the check-in desk Loryn found the sippy cup I had hidden down inside the bag. It scared her to death when I turned around and screamed as she sat there gulping down her sippy. After consulting with the anesthesiologist we determined to try to distract Loryn for the next four hours to keep her from realizing she was hungry and thirsty and try to do the surgery around noon.

Loryn and I had a great time going to Brooke's and playing Rock Band and seeing Brooke's law office. Then the hospital called us to come back.

Long story short, they found a 2 cm wood sliver lodged deep in her foot. The poor girl had been hobbling around with it in there for over a week and a half.

She was so mad when she came out of anesthesia. It took me and two nurses to restrain our usually sweet and agreeable Loryn.

This last Monday we finally got the five stitches out but we took this picture right before going to the podiatrist. Loryn's one complaint to him was that she wanted red stitches not blue ones. He assured her he would put it in her file and be sure to use red ones next time. Lets hope it isn't any time soon.Poor Little Loryn

Final Product (for now)--Master Bathroom



I put the finishing touches on the master bathroom last week but after all the hard work I was too tired to do the finished photos until today. We have been able to use the shower for about three weeks now and we are loving it. Can you believe it? We actually use our master bathroom.




As part of the project I also tiled the vanity countertop and painted the vanity a chocolate brown. This picture was taken during the sanding process of the vanity and before I put in the sink. I was going to save and reuse the existing sink, but I put in a new one and a new faucet instead. In case anyone thinks that was wasteful, the old faucet was brass and dripped randomly. The pop-up drain also leaked randomly making it hard to put anything under the sink because you weren't sure it would be dry or not. Now that I write about it I wonder "WHAT WAS I THINKING?" Of course it was a good idea to go new.



During the tiling process I used the floor in my bedroom to lay out tiles to see which ones would work together. Mysteriously other playroom creatures would work their way into the room to see what was happening.

Kristen turned out to by our toy arranging friend on this occasion.


I made the front panel of the tub removable by tiling a sheet of DensShield and then propping it into place and securing it with silicone. It seems to be very secure. This way when it comes time to do the floor or when we take out the tub, etc, we will be able to simply cut the silicone and remove the panel for easy access. It is an experiment.

BIG IMPROVEMENT!
Maybe next year we will go for the floor.

Sunday, March 21, 2010

Master Bathroom Project

The Before Picture
Our home was built in 1995 and has been owned by several families in that time. Don't ask me why, but in all this time there has never been a shower in the master bathroom. Granted, there has been a lovely jetted tub in the corner, which was fun the two times I have used it since we moved in last August. But neither Dave nor myself are tub people. Obviously the people before us have had to be tub people, but that sends us in an entirely different and disturbing direction I don't want to pursue.

Back on topic. Dave has been gently suggesting I focus my energy on rigging up some kind of shower for our bathroom since we moved in. After a lot of thought in design and cost I finally came to the conclusion that: 1) I would have to do it myself if I wanted to get something half decent in our price range, and 2) I have expensive taste so my version of half decent is probably more intense than someone else's version of half decent, and 3) If you are going to do all the work for half decent you might as well go for awesome.

Result: I plumbed in a new shower head and I am currently tiling a travertine surround. I decided to keep the jetted tub. It still works well and would have been too much work and a huge waste to remove it. I realize it is a little unconventional to have a shower over a jetted tub, but it is also a little unconventional to not have a shower in the master bathroom. Any other options would have cost too much and been to extensive.


STEP 1
First I took out all the drywall that was the only surround on the tub. Our kid's bathroom now has another outlet now due to some questionable electrical I found behind the drywall, but that is another story.

After all the demolition you have to start putting things back together again. This is usually where I start to panic and call Catherine for reassurance.

Sorry Catherine for waking you up on several mornings. Your encouragement is always helpful.

This first picture was taken after the first piece of DensShield went up. (See Step 2)

STEP 2
Though you can't see it, I next teed off the waterlines to the roman fixture and ran hot and cold lines to a shower valve on the left wall. I really enjoy doing PEX. It is quite fulfilling.


STEP 3
Originally I bought cement board to put on the walls in preparation for tiling, but started freaking out when I realized I couldn't even lift one 3x5 sheet of it on my own. That is when I called Dad and he told me about DensShield, a gypsum product coated in fiberglass made for tile and stone. It cuts and hangs almost like sheetrock except you get little fiberglass itchies sometimes. It is more water resistant than cement board, tons easier to work with, and very easy to tile on.

The second picture is after I put up all the DensShield and siliconed all the seams.

STEP 4
I set up shop in the garage since it is still cold and randomly snowy here. A tarp behind the wet-saw has worked just fine.

I just do little batches of thin-set at a time since it would be a shame to be pulled away to watch "Max and Ruby" and have a large batch go to waste.

Note: Anyone who knows my kitchen, the measuring cup that has "Not for food" written all over it is once again really NOT FOR FOOD.

I bought a 1/4" mixing bit for the drill, but was afraid the drill couldn't handle the thickness of the thin-set. I have been pleasantly surprised though. It does just fine on my little batches.

Many thanks to my wonderful husband for letting me take over his parking spot in the garage...again.



STEP 5
The actual tiling.
I have tiled a tub surround before with Catherine when we did her shower in porcelain subway tiles all the way to the ceiling. Compared to that, this has actually gone rather quickly and smoothly. Travertine isn't as scary as it sounds. It may rhyme with Wolverine, but that is where the similarity ends. It is still a ton of work and I currently have a serious case of "man hands" to prove it, but overall, not too hard.

Of course there is always a certain level of mess involved in these things. You probably can't tell, but my face broke out from the grime and the tee-shirt and pants are probably headed to the ragbag soon. Small price to pay for the end product.


STEP 6
Keep tiling. This is where I am at as of 3/20/2010. I am most of the way through two walls. I just need to finish the bottom rows on both and the top row on one. Then I have the valve wall and little pony wall to do. Hopefully it will all be completed this week. Dave and I will love to finally have a shower and not have to use the kid's bathroom down the hall anymore.

Kristen wanted to get into the tub and was mad at me for telling her no. The bottom three tile weren't quite set yet and I didn't want her making a mess. She and Loryn have been such good girls through this process.

The back wall will be done as soon as I finish the bottom row. The decorative rows are made of 4x4 tumbled travertine. I also bought five little flower mosaics to sprinkle into the design.

There is still a lot of work to be done including grouting, sealing, and putting on the fixtures, but we are excited.

Wednesday, March 10, 2010

Old Accomplishments

I decided to update my list of accomplishments based on what I have done since moving to our new home in August. This means I am removing all the old accomplishments from our last home. Here is a list from newest to oldest all my old accomplishments.

  • Tiled Laundry room

  • Worked on cleaning out garage

  • Got good deal on tile

  • Painted master bedroom with Karen and her friend

  • Got laundry room somewhat back together

  • Put in new door to playroom

  • Ripped out laundry room

  • Organized food storage

  • Made shelves for crawlspace

  • Found awesome deal on cabinets

  • Removed ugly boarder in bedroom

  • Got carpets cleaned

  • Made new computer desk

  • Cleaned bathrooms

  • Got laundry under control

  • Helped tile Cath's shower

  • Fabulous Friday

  • Thanksgiving Dinner

  • Decorated Tree

  • Rearranged family room

  • Painted upstairs bathroom

Thursday, January 28, 2010

Bathroom Re-do

I recently added molding and painted the upstairs kids bathroom. Some of these pictures are a little dark but hopefully you will get the idea. It looks a lot better than it did.

BEFORE
Here is a "before" picture of the girl's vanity.


The boy's side of the bathroom "before", complete with dirty laundry on the floor and all.

AFTER
The color isn't very good in this picture because I had to turn off the flash or it glared off the mirror. I put molding about 3/5ths of the way up the wall and painted everything above it a fun bamboo green. Then I painted the molding and wall below it high-gloss, bright white.

The color is a little better in this picture. I put up hooks instead of the towel bar. It is a lot easier for the kids to hang their towels on hooks. But somehow the towels still seem to like the floors of their bedrooms.
I would like to fix the countertop but that is part of a longer term budget. What do you think about blackish countertops? Or how about pain white?